Annaba

  • Follow-up of the Sarouel / Wadi Nile Route Towards the Kharaza and 1st May Exchangers of the Rn 44
  • Study Geotechnical Expertise of the Stability of the Ground for the Project
  • Realization R + 65,5 Sidi Aissa Annaba Lot N03
  • Geotechnical Expertise Study of the Stability of the Field for the Project Realization of 80 Logs
  • Study of Geotechnical Expertise to Realize a Promotion of Corallors Annaba
  • Study of expertise of a land for the realization of the buildings Rdc + 06 + Ss (Lot N 01 and 02) Sidi Aissa
  • Study of Geological and Geotechnical Expertise of a Land for Realization of Buildings for Housing (Lot N ° 09)
  • Geotechnical Study Lot N ° 09 Valmoscort
  • Study of Project Stability, Realization of a Debachia-Fekharine Residential Group
  • Realization Of The Road El Eugla On A Distance Of 03 Kms Through Douar Lekrechi To Selami In Souali
  • Realization Of A Road Linking Sidi Chalabi To El Meraouna On A Distance Of 03 Kms
  • Study of Duplication of Cw 108 (Pk 00 to Pk 05) and Cw 129 (Pk 02 to Pk 11) Relinking Oued Ziad to Sidi Amar
  • Follow-up And Control The Realization Of A Cc Reliant Ras El Hamra To Oued Bagrat
  • Monitoring and Control Construction of Main and Annex Works
  • Study of Access Paths to the New Terminal Including Facilities
  • Study and realization of the links of the road Sarouel Oued-Nil
  • Follow-up Of Construction Of Airplane Parking (J), Straps And Traffic Tracks From Annaba Airport
  • The Technical Follow-up of the Works of Rehabilitation of the Parking Plane E for the New Terminal of Annaba
  • Slip stability study of 240 logt COUBA 02Estudy of Geotechnical Expertise for Realization of a Promotion of Corallors Annaba
    De Slip Expertise Study Rn44
  • Study of Geological and Geotechnical Expertise of a Ground for the Realization of 128 LgtsRouteSeraidi
  • Study of Geological and Geotechnical Expertise of a Land for Realization of Buildings for Housing (Lot N ° 09)