Mila

  • Cw 115 Rehabilitation Study
  • Technical Assistance for the Realization of Cw 115 Rehabilitation Works
  • Study And Follow Up Of Slip Comfort On The Cw 02
  • Design Of The Cw 06 Between Rn 79 And Rn 77 A By Rouached On 26 Kms
  • Followed Beni Haroun Bypass Realization Work On 09 Kms
  • Development Study Path Mila-OuledBouhama -Ahmed Rachedi And Cw 152 With Extension OuledBouhama – Seraghema
  • Ground Slip Comfort Study On Rn 105 At Pk 09 + 000
  • Design Study Of An Art Work On The Cw 1o1 At Pk 04 + 280 At Oued Seguin With Access
  • Planning Study Of The Road Linking Ouled Mohamed And Boulahdjar On 01 Kms
  • Upgrading Of Path Reliant Ouled Mohamed – Boulahdjar On 01 Km
  • Ground Slip Comfort Study On Rn 105 At Pk 09 + 000
  • Realization of an Art Work on Cw 101 at Pk 04 + 280 at Oued Seguin with Access
  • Technical Assistance Development Works In Duplication Way Of The South Entrance To The City Of Ferdjioua On 05 Kms From Pk 31 + 800 To Pk 36 + 800 With Two Structures Of Art
  • Follow-up and Technical Assistance Works Repair Damage Causes by Weather2012 on Cc (Enhanced Repair, Slip Treatment, and Repair of Works of Art and Sanitation
  • RepairDĂ©gatIntempĂ©rie On Rn 77 Pk 63 + 500 At Pk 67 + 000 And Rn 77 From Pk 37 + 400 To Pk 41 + 000 On Different Lots