Souk Ahras

  • Study of Slip Points on Rn16 – 16a – 81
  • Rn 16 Modernization Study Between Souk AhrasAt L, WTebessa Over 20 Km (From Pk124 +000 To Pk144 + 000)
  • Slip Treatment Study on Rn16 – 16a – 81
  • Tracking Slip Reinforcement Work On Rn16 – 16a – 81
  • Slip Treatment Study On Rn20 – 82 – Lot 03
  • Study of the Relinking Route Rn 16 A – Avoidance Rn 16 and Cw 19
  • Geotechnical Study Of The Slip On The Rn 16 And Cw 19 A Lot 01
  • Follow Up Of The Reinforcement And Modernization Work Of The Rn 82
  • Relinking Hameme Tessa And The Limit Of The Wilaya Of Tebessa On 10 Kms (Lot N ° 02: From Pk 75 + 000 To Pk 85 + 000)
  • Monitoring Rn 16 Lot 05 Reinforcement Work: From Pk 134 + 000 to Pk 144 + 000
  • Follow Up Of The Reinforcement And Modernization Work Of The Rn 82 Lot 02 (South)
  • Geotechnical Study of Sliding Points on the Cw19 (Ex-Cc Reliant OuledMoumen and Lahdada)
  • Study of Modernization of Cw 02 Lot 02
  • Follow-up Of The Work Of Modernization Of Cw 02 On 37 Kms (Lot 02: From Pk 10 + 000 To Pk 23 + 000)
  • Follow Up Of The Reinforcement And Modernization Work Of The Rn 82 Lot 04 (North)
  • Tracking Treatment of Landslides on the Cw 19a and Rn 16
  • Tracking Reinforcement Works Of The Rn 16 Lot 05 On 10 Kms
  • Follow-up Of The Reinforcement Of The Rn16 Lot 05 And A Bridge At Pk 127
  • Cc Reliant Tracking Rn82 And Rn20 And Ras Ladeb And Hammam OuledZaid On 10 Kms
  • Follow Up Of Modernization Work Cw (Ex Cc) Reliant Taoura – Merahna On 12 Kms
  • Followed by Cc Reliant Lakhdara – Ouillen On 12 Kms
  • Follow-up of the Cc Reliant Merahna – Lakhdara On 14 Kms
  • Follow-up of Reinforcement Works of Rn 16 (Lot 05: From Pk 134 + 000 to Pk 144 + 000)
  • Follow-up Of Work Of Strengthening And Modernization Of The Rn 82 Relating
  • Between Hameme Tessa And The Limit Of Tebessa On 10 Kms (Lot No 02 From Pk 75 + 000 To Pk 85 + 000) (Additive)
  • Technical Monitoring On Rn 82 North
  • Study Of The Drea Avoidance On The Rn16 With A Work Of Art (4 Ă— 4) X5
  • Technical Monitoring of Modernization and Strengthening of Slips on Rn 16
  • Between Souk Ahras and the Limit of the Wilaya of Tebessa on 72 Kms (2nd Tranche)
  • Technical Monitoring On Rn 82 North
  • Follow-up Of The Processing Of The 04 Slip Points On The Rn 16
  • Technical and Geotechnical Study of the Slip Zone on the Rn 81 Between Pk 83 – Pk 89
  • Follow Up Of Cw 19 Reinforcement Works Between S / Ahras And Ain Seynour On 11 Kms
  • Follow-up Of Construction Of A Bridge On Wadi Medjrda Rn 16 (Pk 98 + 200)
  • Avoidance Realization StudyCw 01 Reliant Sidi Fradj – Rn 81 Enclosed City Merahna On 07 Kms
  • Follow-up of the Works of Realization of an Art Work in Concrete Weapon on Wadi MedjrdaTakouka (CneOuillen)
  • Technical follow-up of the works of:
    1 – Modernization Of The Road Reliant Sedrata And Lw De Guelma (Lot N ° 04),
    2 – Modernization of the Road Linking Birbouhouche and Lw Oum El Bouaghi (Lot No. 03).
  • Completion of Tracking Reinforcement Work on the Rn 16 Lot N ° 05: From Pk 124 + 000 to Pk 134 + 000 and Bridge on Rn 16 to Pk 127
  • Follow-up of the realization of a bridge on the Rn 81 (Pk 90 + 000)
  • Slip Point Processing Technical Assistance on Rn 81 1 – Pk 81 + 800 on Pk 83 + 000 2 – Pk 83 + 000 on Pk 83 + 900 3 – Pk 84 + 100 on Pk 85 + 000
  • Project Technical Assistance: 1- Modernization of the Reliant Sedrata Road and the Limit of the Wilaya de Guelma (Lot N ° 04). 2-Modernization of the Road
  • Linking BirBououche and the Limit of the Wilaya of oum El Bouaghi (Lot N ° 03).
  • Study of Sliding Points Rn 16, Cw 19 A Khemadja Road
  • Technical Assistance Works of Realization Avoidance Ain Seynour A Rn 16 On 4,5 Kms
  • Technical Monitoring of Slip Point Treatment Project on:
    1 – Rn 16 To Pk 81 + 700
    2 – Rn 82 At Pk 65 + 500
  • Slip Treatment Study on Rn 16 at Pk 81 + 700
  • Study of the Expression of the Voice Express Rn 82 Between Taoura and the Limits of the Wilaya of Tebessa on 32 Kms Lot N ° 02
  • Study of Treatment of Sliding Points on the Border Strip (Cw 30) Pk 18 + 400
  • Slip Point Treatment Study on the Rn 82 Pk 65 + 000
  • Update of Slip Point Processing Study on Rn 81 at Pk 114 + 300, Pk 125 + 000, Pk 126 + 000
  • Realization of the avoidance of Souk Ahras city linking Rn 16 South – Rn 81 – Rn 16 North – Cw 19 – Rn 20 – Rn 81.
  • Expression Study Of The Expressway Of The Rn 81 Between Souk Ahras And
  • Lehdada On 42kms .Lot: 04 Between Pk 135 + 000 And Pk 147 + 000.
  • Exceptional Study of the Expressway of the Rn16 between M’daourouche and Wilaya Tebessa on 30kms .Lot: 03 Between Pk 156 + 000 and Pk 166 + 000.
  • Slip Point Tracking on: – Rn 16 Pk 81 + 700 – Rn 82 Pk 65 + 500
  • Slip Study on Ain Seynour Deflection of Pk01 + 600, Pk01 + 650, Pk02 + 050 and Pk02 + 100.
  • Slip Treatment Study on Rn 82 at Pk 57 + 000, Pk 60 + 400, Pk 63 + 000
  • Study of Slip Treatment on Rn 81 at Pk 136 + 000, Pk 136 +