Tébéssa

  • Strengthening Study Of The Rn 10 On 29 Km
  • Follow-up Of Protective Work Of Rn And Cw And Cc
  • Follow-up Of 03 Cc Rehabilitation Works
  • Cc Construction Study Linking B’tita Customs Control Station And B’tita Village To Btita Advance Station On 06 Kms
  • Cn Rehabilitation Study Relating The Rn 82 To Cw02 By Nasla On 12 Kms
  • Study Of Coating In Black Roads In Profit Of Ggf (2EmeTranche) Lot N ° 01 On 24 Kms
  • Rehabilitation Of Cc Reliant Ain Sidi Salah In Ouenza On 07 Kms
  • Technical Assistance for the Project of Realization of the Road Linking the Cw 01 Aras El Euch on 37 Kms (Lot N ° 01: Modernization of the Road connecting the Cw 01 to FezguietR’tem on 19,5 Kms)
  • Rehabilitation Of Cc Reliant Marmouthia At The Rn 16 On 18 Kms
  • Bb Coating Works From Rn 82 From Pk 148 + 000 To Pk 153 + 000 Over 05 Kms Development Works From Crossroads Tebessa ElAouinet And Souk Ahras On Rn 16 To Pk 169 + 400
  • Construction Of Cc Reliant Bir El Ater – Oglat Ahmed (Cw 01) At Post Avance Henchir El Hallouf On 10 Kms (Bir El Ater)
  • Study Of The Avoidance Of Cheria By The Rn 83
    Houidjbet avoidance study
  • Construction Of Cc Reliant Rn 10 Tebessa – El Houidjbet – Bouchebka On 17 Kms
  • Construction Of Cc Reliant Marmouthia At Post Avance Bir El-Houche On 15 Kms (Negrine)
  • Cc Construction Linking B’tita Customs Control Station And B’tita Village To Btita Avance Station On 06 Kms
  • Protective Work From Rn 82 From Pk 125 + 000 To Pk 167 + 000
  • Reinforcement Of The Rn 82 Between The Limit Of The Wilaya Of Souk Ahras And Henchir El H’did On 10 Kms Lot N ° 02 And Lot N ° 03
  • Rehabilitation Of Cw 01 Between The Exit Of BirMokkadem And The Pk 111 + 400 Over 12,200 Kms (Lot N ° 02)
  • Execution Study of an Art Work On Oued Thelidjen (Cc – Thelidjen – R’guiba),
  • Execution Study of the Access Ramps of the Upper Passage on Railway Tracks (Rn 83 – Pk 01 + 400)
  • Study And Monitoring Of The Road In The Mountains Of Oum El Kmakem On 04 Km
  • Rehabilitation Study Of The Communal Road Connecting Ain Zerga In El
  • Guessaira By BerketFras On 16,3 Kms
  • Modernization of the Rn 16 Technical Aode Project Trenchon Concrete Arm Level FejTanoukala
  • «Construction Of The Cc Reliant Cc Bir El Ater – B’tita At The Post Office El Hourchane On 12 Kms (Bir El Ater).
    Lot 7-A: Road Construction
    Lot 7-B: Construction of a Submersible Passage on the (02) Oueds of El Hourchane and Bir El Ater »
  • Modernization Of The Cc Reliant Morsott And The Limit Of The Wilaya Of Oum El Bouaghi On 18 Kms (2nd Slice On 09 Kms)
  • Rehabilitation Of Cc Reliant Cw 01 In Ghoundjaia On 10 Kms
  • Cc Building Relating The Post Advance El Frid At Post Forward El Horchane On 18 Kms (Bir El Ater)
  • Follow-up of preparatory work on the construction of the hopper (development of the existing highways, displacements of constraints including sanitation networks)
  • Duplication Of The Rn 16 Between Tebessa And BoulhafDyr On 09 Km (1st Cut)
  • Modernization Of The Cc Reliant The Rn 16 To Marmouthia (2nd Slice On 10 Kms)
  • Construction Of The Cc Reliant The Rn 16 (Tebessa – Bir El Ater) At The 82 Eme
  • Company Limit El Khenig On 01 Km (Oum Ali)
  • Protective Work From Rn 10 From Pk 137 + 500 To Pk 140 + 000 (Lot N ° 07)
  • Strengthening Rn 10 Between Tebessa And Bekkaria On 07 Kms From Pk 180 + 000 To Pk 187 + 000
  • «Modernization Of The Communal Road Connecting AïnZerga To Guessaira By BerkatFras On 16,3 Kms
    (1th Slice From Pk 0 + 000 to Pk 10,800) « 
  • Modernization Of The Rn 82 On 05 Kms From Pk 110 + 000 To Pk 115 + 000 (Lot N ° 01)
  • Modernization Of The Rn 83 Over 12 Kms From Pk 42 + 000 To Pk 54 + 000 (Lot N ° 01)
  • Realization Of Safety Slides In Concrete Weapon At T’noukla Pass
  • Realization Of The Connections Of The Art Work On Oued Horiher On The
  • Communal Road Connecting Gara Souda To Henchir El H’did
  • Rehabilitation of the Rn 16 Link to the Vor (Enna) on 04 Kms
  • «Technical Assistance Mission for the Follow-up of the following Projects:
    1 – Protection of Rn 16 from Pk 184 + 000 to Pk 185 + 000
    2 – Protection of the Rn 83 from Pk 05 + 000 to Pk 05 + 400
    3 – OA Maintenance On The Rn 16 At Pk 190 + 000
    4 – OA Maintenance On The Rn 10 At Pk 140 + 500 « 
  • Rehabilitation Of Cc Reliant The Rn 16 In Toricha On 2.5 Kms
  • Modernization Of Cc Reliant Cheria In Mardja On 4.5 Kms And Cheria In Abla On 11 Kms
  • Modernization Of The Rn 16 On 22 Kms Between Berzguene And Safsaf El
  • Ouesra (Lot N ° 02 Of Pk 278 + 000 In Pk 289 + 000 On 11 Kms)
  • Modernization of the Cw 07 Between Carrefour Rn 83 and BerdjenOur 11kms (Lot N ° 02: Coating Works).
  • Study Of Three (03) Carrefours On The Rn 10
  • Coating In Bituminous Concrete Of Cw06 Between Ouenza And The Limit Of Wilaya SoukAhras On 06 Kms.
  • Bridge Embankment Construction On Oued Khenndeg (Rn 16- Pk 313). (Followed)
  • Modernization of the Communal Road Reliant Cheria El MerdjaOn 3.2 Kms (2ndTranche) (Followed)
  • Study of Reinforcement of the Ring Road on 2kms.
  • Study of the Avoidance of the City of Bir El Ater
  • Technical Assistance For Project Realization Of A Bridge At Level Oued Berzaguala (White Water)
  • Complementary Study Avoidance Bir El Atter On 06 Km
  • Follow-up And Study Of Completion Connection Work Of Art On Ouk El KhandakCw 16 Pk 313
  • Technical Assistance Modernization Cw Reliant (Chrea And El Mardja On 3,2 Km) 2nd Slice
  • Technical Assistance Mission of the Project: Rehabilitation and Maintenance of the Communal Road Linking Oum Ali to the Border Post on 1,2 Km (Oum Ali).
  • Technical Assistance Mission of the Project: Rehabilitation and Maintenance of the Communal Road Relating the Rn16 To Marmouthia On 07 Kms (3rd Slice And Last) – Negrine.