El Taref

  • Study Of 02 Slips On The Rn 82 On 22 Kms Ain El Karma Bouhadjar – El Tarf
  • Road Rehabilitation Study Rn 82, Rn 84, Rn 44 & Rn 16 (Carrefours Study) Beach Treatment Study Port El Kala
  • Study of 03 Slips on Cw 166 in the Following Mileage Points (03 + 100, 03 + 200,05 + 000)
  • Study of Strengthening a Slip on Cw 166 of Pk 02 + 000
  • Study of Duplication of the Rn 44 Lot 02
  • Study Of Rehabilitation And Strengthening Of The Rn 82 On 10 Kms (08Glissements)
  • Follow-up Of Enlargement And Enlargement Of The Hanging Bridge Of Chihani
  • Follow-up Of Comforting Sliding Points On The Rn 82 Reliant Bouhdjar – El Tarf
  • Follow-up Of Development Of 03 Carrefours (02 On Rn 44 And 01 On Rn 82)
  • Study of the realization of the bridge in Sidi Messaoud
  • Development Study Of Cw 109 On 02 Km
  • Follow-up Of Maintenance And Repair Of 03 Cc
  • Tracking Reinforcement Work DeCw 111 On 12 Kms From Pk 22 + 500 To Pk 34 + 500
  • Tracking Cw 105 Strengthening Work 05 Kms From Pk 35 + 000 To Pk 40 + 000
  • Technical Assistance for the Control and Monitoring of Deflection and Protection of the NetworkApTraversed by the East-West Highway (Section N ° 03 Pk 400 + 810 Au Pk 422 + 035)
  • Realization Study Road Reliant ZacDaira Mostapha And Rn 84 A
  • Protection of Rn 82 With Concrete Pit From Pk 4 + 500 To Pk 6 + 000
  • Cw 118 North Modernization Study Over 10 Kms From Pk 000 + 000 To Pk 10 + 000
  • Development Study Of The Beach Front Of El Kala – Great Beach – About 1,5 Km 

Coastal Beach Slope Comfort Study – El Kala

  • Study And Realization Of A Dalot At The Cite DairaMostapha (Lot Study)
  • Mastery Of Modernization Of The Rn 82 On 22kms .El Tarf-Ain El Kerma (Pk15 At Pk 27).
  • Project Management of the Modernization of Cw 118 North on 10 Kms from Pk 000 + 000 to Pk 10 + 000
  • Design Study Of The Rn44 In 2 Ă— 2 See On 7.5 Kms. Bouteldja And El Tarf From Pk154 + 000 To Pk 161 + 500 (Lot N ° 02).
  • Study and Technical Follow-up: Enlargement and Reinforcement of the Rn16 Between Drean and the Limit of the Guelma Wilaya on 8kms.
  • Study and Technical Follow-up: Enlargement and Reinforcement of the Rn 16a Between Drean and the Limit of the Guelma Wilaya on 08 Kms.
  • Study And Repair Level Flow Cw 02 On 500 Ml Community El Chatt
  • Divide Rn 44 In (2 * 2 lanes) Over 18 Kms Sidi Kaci – Bird Lake From Pk 137 To Pk 143
  • Topographic Survey Work At Area Level Or Bridges Construction Is Expected Implementation Of New Reference Points: Pk 370 + 934, Pk 371 + 230, Pk 371 + 280, Pk 371 + 438, Pk 371 + 457, Pk 372 + 290.
  • Topographic Level Survey Work or Prevue Dalot Construction. Implementation of New Reference Points: Pk 367 + 720, Pk 368 + 438, Pk 369 + 870.
  • Topographic Level Survey Work or Expected Dalot Construction. Implementation of New Reference Points: Pk 340 + 588, Pk 342 + 843, Pk 344 + 553.
  • Topographic Level Survey Work or Expected Dalot Construction. Implementation of New Reference Points: Pk 386 + 591, Pk 386 + 873, Pk 387 + 203, Pk 387 + 538, Pk 388 + 443, Pk 389 + 380, Pk 390 + 534.
  • Implantation of Iron Stakes at Axis Level Every 100 Meters from the Freeway and Raised Axis from the Section 02 Freeway (Pk 321 + 800 to Pk 326 + 500).
  • Topographic Profile Works Across the 20 M in the Field of Section 02 of the East – West Highway Project.
  • Topographic Profile Works Across All 20 M On the Field of Section 01_02 of the Project « East-West Highway ».
  • Topographic Brigade Rental
  • Implantation and lifting of E-profiles across Tn over the Width of the RoW every 20 M from Pk 321 + 800 to Pk 326 + 560.
  • The Realization of the Implantation of the Axis Stakes Every 100 M On the Field of Section 02 of the Project Except the Stations.
  • Topographic Level Survey Work or Expected Bridge Construction. Implantation Of New Reference Points: Pk 362 + 229, Pk 362 + 253, Pk 362 + 688, Pk 362 + 736, Pk 362 + 748, Pk 364 + 450, Pk 364 + 944, Pk 364 + 949.
  • Implantation and lifting of profiles E through Tn over the Width of the RoW every 20 M from Pk 321 + 800 to Pk 326 + 540.
  • Geotechnical Study Of The Site Ben Amar On 20 H
  • Geotechnical Study Site Geurgour 02 Commune Of El Tarf Area 25 H