Topographical studies

  • TARF
  • Topographic Survey Work At Area Level Or Bridges Construction Is Expected Implementation Of New Reference Points: Pk 370 + 934, Pk 371 + 230, Pk 371 + 280, Pk 371 + 438, Pk 371 + 457, Pk 372 + 290.
  • Topographic Level Survey Work or Prevue Dalot Construction. Implementation of New Reference Points: Pk 367 + 720, Pk 368 + 438, Pk 369 + 870.
  • Topographic Level Survey Work or Expected Dalot Construction. Implementation of New Reference Points: Pk 340 + 588, Pk 342 + 843, Pk 344 + 553.
  • Topographic Level Survey Work or Expected Dalot Construction. Implementation of New Reference Points: Pk 386 + 591, Pk 386 + 873, Pk 387 + 203, Pk 387 + 538, Pk 388 + 443, Pk 389 + 380, Pk 390 + 534.
  • Implantation of Iron Stakes at Axis Level Every 100 Meters from the Freeway and Raised Axis from the Section 02 Freeway (Pk 321 + 800 to Pk 326 + 500).
  • Topographic Profile Works Across the 20 M in the Field of Section 02 of the East – West Highway Project.
  • Topographic Profile Works Across All 20 M On the Field of Section 01_02 of the Project « East-West Highway ».
  • Topographic Brigade Rental
  • Topographic Level Survey Work or Expected Bridge Construction. Implantation Of New Reference Points: Pk 362 + 229, Pk 362 + 253, Pk 362 + 688, Pk 362 + 736, Pk 362 + 748, Pk 364 + 450, Pk 364 + 944, Pk 364 + 949.