Jijel

  • Geotechnical and technical study and followed by the road CW39 wilaya of Jijel sue 11km,
  • Geotechnical and technical study and followed by the road CC18 wilaya of Jijel sue 16km,
  • Study of 45 landslides in the wilaya of Jijel,
  • Study and follow-up of the work of rehabilitation of the CW 135 between Kaous – El Amir on 10 kms jijel,
  • Study and follow-up of damage repair work on CW 132 jijel,
  • Study of the road linking Kalaâ Diss – Andlou – Hammala on 10 Kms – APC Ghebala – Jijel,
  • Technical assistance for the opening and rehabilitation of the CC 19 to El Guitone – APC Ghebala – Jijel,
  • Technical assistance for the rehabilitation and coating of the road connecting Souk Lahad to Kliâ on 02 Kms – APC Ghebala,
  • Study and follow-up of the rehabilitation works of the road linking CC 17 and Mechtet Beni Daoud – APC Ghebala – Jijel,
  • Study of the road between Grayou and Tamakhart on 08 Kms – APC Ouled Rabeh – Jijel,
  • Study and follow-up of the CC 17 between Fedj Lakhemis and Sidi Zarouk on 7,5 Kms – APC Sidi Maârouf – Jijel,
  • Study and follow-up repair of damage on the CC 19 between Bordj Ali and El Ouadia on 08 Kms – APC Settara – Jijel,
  • Study of 09 Kms of tracks – APC Settara – Jijel,
  • Study and follow-up of the development and paving works of the road leading to El Ouati over 2.6 Kms – El Milia,
  • Study and follow-up of damage repair works on the road between CC 20 and Ouled Yahia on 3.4 km – El Milia,
  • Study and follow-up of the development and paving of the roads of the city of El Milia 2.5 km – El Milia.