Material and human resources
- 1- Human resources (51 workers):
- 13 TP Engineers.
- 06 Engineers Civil Engineering
- 03 Geotechnical Engineers.
- 02 engineers in hydraulics
- 06 Topographic Brigades.
- 02 Consultant Doctors (Hydraulics, Civil Engineering and Geotechnics).
- 02 Engineers of Arts.
- 08 Senior Technicians TP.
- 06 technical agents
- 08 administration agentsÂ
- Â 2- Material resources:
- Technical Software
- 02 Workstation with TOPOCAD software (topo + route).
- 01 station of polaris strada (topo + route) V.4.83F 2006
- Technical software:
- PLAXIS V8.2 2006.FEM.
- SPA2000.
- GRAVWALL.
- SLOPE / W. stability of the slopes.
- SEEP / W flows.
- slope geostru 2006.
- paratie 2006 molded walls and berlinoises.
- MP 2006 piles and micro-piles.
- MDC 2006 retaining wall.
- Flac V5 2006 FEM.
- geostudio 2004. geoslope international.
- Plaxis 3D foundation 2006.
- Plaxis 3D tunnel.
- walap sheet piles.
- load cap 2006 foundations.
- FIDES GEOSTABILITY.
- MSEW V.3 2006 (walls reinforced by geogrid, geotexile, ..)
- Topography:
- 03 Stations – LEICA 407.
- 01 SOKIA E610 station.
- 01 Theodolites.
- 01 RDS.
- 02 Levels.
- All other accessories (tripod – test pattern – milestones – chains).
- Â Reprography:
- 02 Photocopiers.
- 03 A4-A3-A2 printers.
- 02 plotter HP 500.ET 500 PLUS.
- Computer science:
- 10 microcomputer P4.
- 02 HP portable microphone.
- 02 Workstations with TOPOCAD software (Route And Topography).
- 02 Workstation with TOPOGRAPHY software.
- 01 Workstation with software ART WORK.
- Â Rolling stock:
- 13 Connecting vehicles.
Site créé par Fadria International.