Material and human resources

  • 1- Human resources (51 workers):
  • 13 TP Engineers.
  • 06 Engineers Civil Engineering
  • 03 Geotechnical Engineers.
  • 02 engineers in hydraulics
  • 06 Topographic Brigades.
  • 02 Consultant Doctors (Hydraulics, Civil Engineering and Geotechnics).
  • 02 Engineers of Arts.
  • 08 Senior Technicians TP.
  • 06 technical agents
  • 08 administration agents 
  •  2- Material resources:
  • Technical Software
  • 02 Workstation with TOPOCAD software (topo + route).
  • 01 station of polaris strada (topo + route) V.4.83F 2006
  • Technical software:
  • PLAXIS V8.2 2006.FEM.
  • SPA2000.
  • GRAVWALL.
  • SLOPE / W. stability of the slopes.
  • SEEP / W flows.
  • slope geostru 2006.
  • paratie 2006 molded walls and berlinoises.
  • MP 2006 piles and micro-piles.
  • MDC 2006 retaining wall.
  • Flac V5 2006 FEM.
  • geostudio 2004. geoslope international.
  • Plaxis 3D foundation 2006.
  • Plaxis 3D tunnel.
  • walap sheet piles.
  • load cap 2006 foundations.
  • FIDES GEOSTABILITY.
  • MSEW V.3 2006 (walls reinforced by geogrid, geotexile, ..)
  • Topography:
  • 03 Stations – LEICA 407.
  • 01 SOKIA E610 station.
  • 01 Theodolites.
  • 01 RDS.
  • 02 Levels.
  • All other accessories (tripod – test pattern – milestones – chains).
  •  Reprography:
  • 02 Photocopiers.
  • 03 A4-A3-A2 printers.
  • 02 plotter HP 500.ET 500 PLUS.
  • Computer science:
  • 10 microcomputer P4.
  • 02 HP portable microphone.
  • 02 Workstations with TOPOCAD software (Route And Topography).
  • 02 Workstation with TOPOGRAPHY software.
  • 01 Workstation with software ART WORK.
  •  Rolling stock:
  • 13 Connecting vehicles.