Skikda

  • Technical Assistance (Lot N ° 05): Rehabilitation Of Cw 201 On 04.8 Kms – Ramdane Djamel Commune –
  • Monitoring Works Lot N ° 03: Rehabilitation Of The Road Reliant Rn 44 Rn 03 Ab Over 600 Ml (CneAzzaba)
  • Work Monitoring Lot N ° 01: Rehabilitation Of The Road Reliant Ahmed Salem Bouyaghil On 4.8 Kms (CneKerkera)
  • Lot N ° 03: Rehabilitation Of Cc Reliant Tarfa – Jenane El Annab On 10,5 Kms Commune Beni Oulbene
  • Lot N ° 05: Rehabilitation Of The Cc Reliant The Rn 43 – Legregues On 08 Kms
  • Slip Treatment On Cw33 At Pk14 + 400 (Lot # 01).
  • Slip Treatment On The Cw33 At Pk16 + 200 (Lot No. 02).
  • Slip Treatment Study on Cw 06 at Pk 02 + 000, Pk04 + 000 and Pk 06 + 000
  • Rehabilitation Of The Road Linking Cw33 To Legraier On 4.7 Kms
  • Slip Treatment Study on Cw 12 at Pk 13 + 000
  • Study Of The Duplication Of The Rn 03 Between El Hadaik And Salah Bouchaour On 19 Kms
  • Lot N ° 01: Technical Assistance To The Duplication Of The Rn44 Between Skikda And El Harrouch On 07kms From Pk 4 + 500 To Pk11 + 500.
  • Technical Assistance to Lot Work N ° 05: Rehabilitation of Cw 07 Between Pk 69 + 200 At Pk 77 + 000 On 08kms Between Ain Lemcid And Siouane.
  • Modernization Of The Rn 43 On 7kms From Pk 154 + 000 To Pk 161 + 000
  • Deviation Study Of The Town Road Located In The Basin Of Boussiaba Dam In El Milia On 6 Kms
  • Slip Treatment Study on Cw 07 at Pk118 +000
  • Follow-up Of Cw12 Repair Works On 04 Kms Between Pk 15 + 000 And Pk28 + 000.
  • Study of the Avoidance of the Municipality of Kerkera.
  • Slip Repair on Cw 28 at Pk 3 + 000 and 26 + 000
  • Elimination of a black dot at Pk 47 + 100 of Rn 85
  • Rehabilitation Of The Road Linking Cw 10 Kef Fatima On 3.6 Kms Commune Of Ben Azzouz
  • Technical Assistance for the follow-up of works of: Lot N ° 05: Realization of two works of art on the Rn 43 with Pk 131 + 800 and Pk 133 + 500.
  • Technical Assistance Project Monitoring N ° 02 Rehabilitation Road Rn 03 El Hadaiek On 1,2 Km
  • Cw 102 Modernization Study Over 15 Km From Pk 15 + 000 To Pk 30 + 000
  • Development Study of a Crossroad at the intersection of Rn85 / Refref – Sidi Mezghiche.
  • Technical Assistance for the follow-up of the works of: Lot N ° 02: Duplication of Rn44 Ac On 3.8 Kms Between Pk 00 + 000 and Pk 03 + 800.
  • Monitoring Work Repair Cw 12 On Kms Between Pk 15 + 000 And Pk 28 + 000
  • Follow Up Of: Rehabilitation Of The Road Linking Cw 132- Halem On 5.1 Kms.
  • Work Assistance From: Cw28 Repair Between Pk 3 + 500 And Pk10 + 300.
  • Study Duplication Of The Rn 44aa Rn 03 Ab And 44 Ac And 44 Aa On 8.5 Kms
  • Update of the Study of the Duplication of Rn 44 Between Skikda and El Harouch on 07 Kms From Pk 4 + 500 to 11 + 500
  • Follow-up Of The Rehabilitation Work Of The Road Cw 132 Halem On 5.1 Kms
    Kechera Avoidance Study
  • Rehabilitation Of The Road Reliant Cw 33 Legrair On 4.7 Kms Commune Of Zerdaza
  • Slip Point Treatment Cw 12 Pk 13 + 000 As De Felfla
  • Project Cw06 « Repair Of Cw06 » Pk 14 + 700 At Pk 11-200 Lot 1
  • Repair Work Of The Work Oued Barroun Rn 85 Pk22 + 500
  • Sliding Study On 03 Point CwChaaba Oued Hadj Ali
  • Slip Treatment On Cc Iron Cap At Pk 01 + 100 And Pk 01 + 500 And Pk 02 + 500
  • Slip Treatment On The Cw 07 Pk 30 + 200 Pk 38 + 800 And 40 + 500 Pk 26 + 600
  • Development Study Of The Crossroads On Rn 43 Metatla / Legragues / Ccbouyachil
  • Duplication Of The Rn 44 AC On 3.8 Kms Between Pk 00 + 00 And The Pk 03 + 800
  • Technical Assistance For Repair Cw 06 Between Pk 3 + 000 At Pk 12 + 000
  • Rehabilitation Of Cc Reliant Zana-Oued Moudjar Sue 04 Kms
  • Comforting 03 Three Slip Point Su CwTakouk And Ghar Tain
  • Release of Rn 03 from Pk 7 + 900 to Pk 16 + 200 on 8.2 Kms between El Hadaiek and Randhan Djamel
  • Technical Assistance For The Follow-up Of The Duplication Of The Rn 44 AC On 3.8 Kms From Pk 0 + 000 To 3 + 800
  • Slip Treatment On Cw 07 At Pk 124 + 700
  • Slip Treatment on Cw 07 at Pk 118 + 000 and Pk 67 + 300
  • Reconstruction of Ali Oued Lachache Bridge Rn 43 Pk 131 + 800
  • Rehabilitation Of Cc Reliant Zana Oued Moudjar On 04 Km (Municipality Of Bekoucch Lakhdar)
  • Milking Study Lead From A Slip Point On The Cw 07 To Pk 65 + 700 Commune Of Beni Zid
  • Assistance And Follow-up Technical Project Rebuilding Of A Work Of Art Rn 43 Pk 131 + 800
  • Technical Assistance Project 03 Slip Point On Cw 07 Of Pk 30 + 200, Pk 38 + 800 And Pk 40 + 500
  • Study of Treatment of Duplicates from Rn 43 to Pk 199
  • Study of 08 Landslides on the Road Reliant Oueldja – OuledAttia
  • Study And Monitoring Of Opening And Rehabilitation Of Slopes (50 Km)
  • Study And Monitoring Of Opening And Rehabilitation Of Tracks (70 Km)
  • Study of Duplication Rn 80 The Bakouche Entry Lakhdar On 01 Kms (Study, Retaining Wall, Books)
  • Study and Realization of a Passage -El Naidjett – (Lot Study)
  • Study Project What Remains Bouabaze Cite,
  • Study of the Duplication Expertise of Rn 44