Road studies

Monitoring and Road and Motor Studies
The geo-consulting company realized the following main projects

EL TAREF REGION

  • Study of treatment of 02 landslides on the bouhadjar RN80
  • Sanitation study of the city of TARF.
  • Sanitation study of Sidi Rihane commune of besbes.
  • Study of the master plan of the wilaya of Tarf.
  • Protection study of the fishing port of El-Kala.
  • Study and follow-up of 8 landslides on the RN82 Bouhadjar
  • Study of 04 landslides on the CW166 EL-KALA
  • Study of 02 landslides COMMON OF ZITOUNA
  • Study of 04 landslides COMMON DE BOUGOUS
  • Duplication study of the RN44 – Lot N ° 02 between El Kala and El Taref with connection to the East-West motorway over 24 kms
  • Control and monitoring of the refurbishment works of 03 CC – El Taref
  • Geotechnical study of urbanization of the site Guergour 02 on 25 H – El Taref
  • Geotechnical study of urbanization of the site Ben Amar on 20 H – El Taref
  • Control and monitoring of reinforcement work on the CW 111 on 12 km – El Taref
  • Topographic work for sections 01 of the East-West highway in favor of the Japanese Constrium for the Algerian highway (survey, implementation and study of cross sections …) on 70 Kms
  • Study and follow-up of the construction works of (03) three crossroads on the RN 44 at PK 165 and PK 166 + 200 and on the RN 82
  • Study of a bridge at Sidi Messaoud – Berrihane – El Taref
  • Urban planning study on 02 Kms – APC El Chatt – El Taref

SKIKDA REGION:

  • Duplication study of the RN80 + a bridge + a retaining wall at bakhouche lakhder – Skikda
  • Study of a bridge at the Zit El Emba dam avoidance
  • Study of 02 hill dams in Skikda wilaya
    02 slip study on RN 44 AB Skikda
  • Study of 08 landslides on the common oueldja road from ouled attia.wilaya of Skikda.
  • Study and follow-up of the opening and rehabilitation works of 50 km of tracks – El Harrouch
  • Study and monitoring of the opening and rehabilitation works of 70 km of tracks – El Harrouche.

REGION OF SOUK AHRAS:

  • Study of 16 landslides in the wilaya of Souk Ahras.
  • Study and follow-up of the RN 16 Souk Ahras
  • Study and follow-up of the modernization of the CW 02 – Lot N ° 02 on 10 Kms – Souk Ahras
  • Study of 08 slip points on the RN 20 – Souk Ahras
  • Study and follow-up of 08 slip points on the RN 82 – Souk Ahras
  • Study and follow-up of 06 slip points on CW 19A – Souk Ahras
  • Control and monitoring of the reinforcement works of the RN 16 – Lot N ° 01, Lot N ° 02 and Lot N ° 05 – Souk Ahras
  • Control and monitoring of the CW (ex-CC) modernization works between Taoura and Merahna over 12 kms – Souk Ahras
  • Control and follow-up of the repair work of the CC connecting Merahna to Lakhdara on 14 km – Souk Ahras
  • Control and monitoring of the repair works of the CC linking Lakhdara to Ouillen on 12 kms -Souk ahras
  • Control and monitoring of the repair works of the CC connecting RN82 and RN20 to Ras Lahdab by Hammam Ouled Zaid on 10 Kms – Souk Ahras
  • Control and follow-up of the reinforcement works and the modernization of the RN 82 between Hammam Tassa and L.W de TĂ©bĂ©ssa – Lot N ° 02 on 10 Kms – Souk Ahras
  • Study for the realization of a crossroads at the southern entrance of the city of Bouhouche – Souk Ahras
  • Study the road connecting the RN 16 – the avoidance on the RN 16 and the CW 19 – Souk Ahras
  • Study and follow-up of the construction works of two (02) bridges on the RN 16 at PK 127 and PK 126 + 500 – Souk Ahras

TEBESSA REGION:

  • Study of reinforcement of the RN 10 between TĂ©bĂ©ssa and the limit of the wilaya of Oum El Bouaghi on 29 Kms – TĂ©bĂ©ssa
  • Rehabilitation study of the CC connecting the RN 82 to the CW 02 by Nasla on 12 Kms – TĂ©bĂ©ssa
  • Study and realization of the road connecting Cheria to Abla on 11,5 Kms – TĂ©bĂ©ssa
  • Study of 24 km of roads and tracks for the benefit of GGF – Lot N ° 02 – 2nd Tranche – TĂ©bĂ©ssa
  • Technical assistance for the monitoring of the rehabilitation works of the CC connecting Boukhadra to the RN16 on 05 KM – TĂ©bĂ©ssa
  • Technical assistance for the follow-up of the rehabilitation works of the CC linking ChĂ©ria to Dhalaâ on 16 KM – TĂ©bĂ©ssa
  • Technical assistance for the follow-up of the rehabilitation works of the CC linking Bir El Ater to B’tita on 44 KM – TĂ©bĂ©ssa
  • Technical assistance for the follow-up of the protection works of RN16 on 48 KM – TĂ©bĂ©ssa
  • Technical assistance for the follow-up of repair works and protection of the accomodations of the CW01 between Bir El Ater and Ogla El Malha on 20 KM – TĂ©bĂ©ssa
  • Technical assistance for the follow-up of the rehabilitation works of the CC connecting Ghorab to L.W Khenchela on 02 KM – TĂ©bĂ©ssa
  • Technical assistance for the follow-up of the rehabilitation works of the CC linking Ogla El Malha to Henchir Hashas via Pascal on 04 KM – TĂ©bĂ©ssa

REGION OF ANNABA

  • Topographic work for sections 02 of the East-West highway in favor of the Japanese
  • Constrium for the Algerian highway (survey, implementation and study of cross sections …) on 34 Kms
  • Control and follow-up of the construction work of the links connecting the Sarouel-Oued Nil road to the Kharaza interchanges and May 1st to the RN 44

REGION OF SETIF:

  • Technical assistance for the work of rehabilitation of the CW 10 between the RN 28 and Ouled Tebban on 24 Kms – Setif

BATNA REGION:

  • Study of modernization and strengthening of the RN87 on 45 kms – Lot N ° 06 and Lot N ° 07 – Batna
  • Control and monitoring of the construction works of the road linking Tagoust to Menaa on 6.5 Kms- Batna
  • Control and monitoring of the construction works of the road linking Taksirtt to Larbaa on 23.5 Kms – Batna
  • Study and follow the road linking Bouzina – Larbaa through Theniet Trissiti on 05 Kms – 1st Tranche – Batna

MILA REGION:

  • Study and follow-up for the rehabilitation of the CW 115 over 22 kms – Mila
  • Study and follow-up of 13 landslides on CW 02 – Mila
  • Planning study of the CW 06 between RN79 and RN 77 A by Rouached on 26 Kms – Mila
  • Technical assistance for the construction of a viaduct on Oued Manar – Mila
  • Technical assistance for the realization of the work of the Beni Haroune complex bypass – 2nd Tranche on 09 Km

JIJEL REGION:

  • Geotechnical and technical study and followed by the road CW39 wilaya of Jijel sue 11km
  • Geotechnical and technical study followed by the road CC18 wilaya de Jijel sue 16km
  • Study of 45 landslides in the wilaya of Jijel
  • Study and follow-up of the rehabilitation work of the CW 135 between Kaous – El Amir and 10 km jijel
  • Study and follow up of damage repair work on CW 132 jijel
  • Study of the road linking Kalaâ Diss – Andlou – Hammala on 10 Kms – APC Ghebala- Jijel
  • Technical assistance for the opening and rehabilitation of the CC 19 to El Guitone – APC Ghebala – Jijel
  • Technical assistance for the rehabilitation and paving of the road connecting Souk Lahad to Kliâ on 02 Kms – APC Ghebala
  • Study and follow-up of the rehabilitation works of the road linking CC 17 and Mechtet Beni Daoud – APC Ghebala – Jijel
  • Study of the road between Grayou and Tamakhart on 08 Kms – APC Ouled Rabeh – Jijel
  • Study and follow-up of the CC 17 between Fedj Lakhemis and Sidi Zarouk on 7,5 Kms – APC Sidi Maârouf – Jijel
  • Study and follow-up of damage repair on the CC 19 between Bordj Ali and El Ouadia on 08 Kms – APC Settara – Jijel
  • Study of 09 Kms of tracks – APC Settara – Jijel
  • Study and follow-up of the development and paving of the road leading to El Ouati on 2,6 Kms – El Milia
  • Study and follow-up of damage repair works on the road between CC 20 and Ouled Yahia over 3.4 Kms – El Milia
  • Study and follow-up of the construction works and road surfacing of the city of El Milia over 2,5 Kms – El Milia

REGION OF GUELMA:

  • Study of expertise on the RN 20 on 10 Kms
  • Study and follow the road connecting the RN80 and CW123 on 11kms to the wilaya of Guelma.
  • Project management of the landslide treatment works on the RN 21
  • Project management of landslide treatments on the CW 19 in three separate lots
  • Study of the landslide on the RN 16 from PK 68 + 400 to PK 68 + 800
  • Study for the construction of a work of art on the CW 126 (Moulin Ben Amor) withcorrection of the long profile
  • Project management of the landslide consolidation work on the CW 162 at PK 02 + 500
  • Master of works of reinforcement of the landslide occurred on the RN 81 with the PK 01 + 300
  • Study of widening and comforting (02) works of art on the CW 102 in two separate lots
  • Study for the correction of the profiles across the RN 20 in (03) three variants.
  • Stability study of the slopes of the RN 20 (Ben Tabouche)